The project scope was 990 KVA,11 KV,HT installation, LT installation, Cable Laying, DC SMPS installation, along with PDUs at each floor, cable trays, earthing, lighting system, lightening arrestors, UPS cabling etc. The biggest challenge for the site was the space constrains to accommodate the HT/ LT distribution along with the cable routes. The MSC is on three floors and each floor has AC/DC Distribution. The challenge to provide less than 0.5 ohm earthing with the space constrain was overcome with combination of the maintenance Free and conventional Earthing. Around 15000 Mtr cables of various sizes were laid on site.

Two storied building has switching Centre at each floor. The project scope was 11KV,630 KVA HT installation, LT distribution, Cable Laying, DC SMPS installation, along with PDUs at each floor, cable trays, earthing, lighting system, lightening arrestors, UPS cabling etc.

Two storied building has switching Centre at each floor. The project scope was 11KV,750 KVA HT installation, LT distribution, Cable Laying, DC SMPS installation, along with PDUs at each floor, cable trays, earthing, lighting system, lightening arrestors, UPS cabling etc.

The Project Scope was 11 kV, 750 KVA HT installations along with 1250 Amp Bus duct. The Data Centre is located at 6 th Floor and Bus duct is laid from Ground floor to the Sixth Floor. The intelligent Lighting system installed operates on Motion, Presence and day light sensors detectors. The Underfloor Trunking provides supply to the racks and thus the entire project does not have any conduting for Lighting and power supply.

The Indore Base Factory and Head quarter for Tata International, the project scope was to electrification of Board room with intelligent lighting solution. The ATCO based Lighting System was integrated with Audio Visual Conferencing System. The Display Area, where company leather products were displayed, was illuminated with decorative lighting to enhance the product display value.

The major player In Animation, Prana studio has around 700 Desk Sitting Capacity with Around 1200 server. The Scope involved LT distribution, cable Laying, 4 X 360 KVA UPS Installation, Networking system, Earthing system.

The leading post Production Film Processing Company, the project scope was LT distribution, Cable laying, Power distribution, earthing system, music system and Networking. The sensitivity of recording equipment and thus the proper earthing at each AVID and other rooms were the challenging part of the project.

The Leading car manufacturer company’s Regional office of around 50,000 sqft was set up in Nerul, New Mumbai. The Aesthetic value and presentation with lighting effects were the challenging part of the project. The Façade Lighting of the Building along with architectural lighting is a highlight of the project.

The 38000 sqft office project was completed in 40 days. The project scope involves 11KV 1000 KVA unitised Substation, Cable Laying, LT distribution, Lighting and Power System. The aesthetics with lighting effect is a major highlight of the project.

The leading film maker companies foray into television Industry by setting up the studio at their Andheri Film processing studio. The Major highlight of the project was the intelligent lighting. The dimming requirement per room was defined as per the requirement of the Viewing angles and overall aesthetic requirement. The Lighting presets were defined room. The sensitive equipments required good earthing to eliminate the disturbances at audio and video signals.

FT is the first private equity exchange in India. The Data Centre project is in collaboration with Schneider Electric, and has a white space of approximately 15,000 sq ft and involves LT distribution, cable laying, cable trays and intelligent Lighting system to conserve the energy.

The project is for pharma packaging, a packaging agency for Jhonson & Jhonson Ltd. The 50,000 sq ft pharmaceutical project was completed in 90 days. The project scope involves establishment of 22KV, 315KVA, substation, HT installations , cable laying, LT distribution, Lighting and power system. Cable trays, Earthing system. The project involves Clean Room application.